13 09, 2015

Skellerup vertical Injection Moulder

2017-02-01T22:42:14+00:00September 13th, 2015|

Machinery Relocations was recently employed by Skellerup to extract their old injection moulder from the Skellerup factory floor and install two new vertical injection moulders.

The two new 6.5 tonne vertical injection moulders needed to be unloaded from a 40 ft container onsite and positioned in to the Skellerup factory accordingly.

The MRL boys were also required […]

30 03, 2015

Health and Safety management

2015-05-17T22:58:59+00:00March 30th, 2015|

As an employer, you are responsible for the health and safety of everyone who does work for you or comes into your worksite. This includes employees, contractors and visitors, and volunteers in the workplace.

It is essential before you start moving machinery, either within your workplace or relocation, that you assess the risks and […]